j623_第1頁
已閱讀1頁,還剩0頁未讀, 繼續(xù)免費閱讀

下載本文檔

版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進(jìn)行舉報或認(rèn)領(lǐng)

文檔簡介

1、SH3503–J623主匯線槽、主橋架安裝檢查記錄InstallationInspectionRecdofMainRacewayCableTray工程名稱:ProjectDeion:單元名稱:UnitDeion:名稱Name檢查項目ItemofInspection檢查結(jié)果InspectionResult檢查日期InspectionDate備注Remark1匯線槽、橋架安裝橫平、豎直,多層安裝時各層彎曲部分的弧度一致,且層間間距均勻,彎曲

2、半徑應(yīng)滿足電纜敷設(shè)時彎曲半徑的要求InstallationofmainracewayCabletrayshouldbeflatstraight.Whenseverallayersareinstalledradianofcurvinginlayersshouldbeconsistentinevendistancecurvingradiusshouldmeettherequirementsofcablelaying.2鍍鋅、涂漆表層完好無損

3、Galvanizedvarnishedcoatingshouldbeingoodcondition.3對口連接牢靠、無毛刺,并預(yù)留適當(dāng)?shù)呐蛎涢g隙,螺栓連接處已安裝加強(qiáng)板,螺母在匯線槽的外側(cè)Connectionofcableendsshouldbefirmwithoutburrsisreservedwithproperexpansionclearance.Reinfcingplateisinstalledatboltingjoints.N

4、utsarelocatedoutsidetheraceway.4匯線槽、橋架與支架連接牢靠,水平安裝長度超過50m有應(yīng)力消除措施Connectionofracewaycabletraybracketisfirmlengthofhizontalinstallationisbeyond50mameasurefstressreleaseistaken.5匯線槽、橋架已避開強(qiáng)電磁場、高溫、腐蝕性介質(zhì)Racewaycabletrayarekept

5、awayfrommediumofhighelectromagicfieldhightemperatureerosion.6匯線槽上的保護(hù)管開孔位置在匯線槽高度的23處以上Openingholefracewayprotectionpipeislocatedabove23heightcleartheraceway.7匯線槽、橋架清凈,內(nèi)部平整、光潔、無雜物、無毛刺Itiscleaninsurfaceofracewaycabletrayisf

6、latclearwithoutdebrisburrsinside.8匯線槽的隔板固定合理、牢靠Clapboardofracewayisfixedproperlyfirmly.9匯線槽的蓋板固定合理、牢靠Theracewayiscoveredproperlyfirmly.10匯線槽的支架間距合理,且焊接牢靠Distancebetweenbracketsofracewayisreasonableisfixedbywelding.11匯線槽有

7、良好的接地Theracewayisproperlygrounded.注:主匯線槽、主橋架指就地接線盒至控制室之間的匯線槽、橋架。Remark:Mainracewaymaincabletrayrefertoracewaycabletraybetweenlocalterminalboxthecontrolroom.建設(shè)監(jiān)理單位ConstructionOwnerSupervisionUnit施工單位ConstructionUnit專業(yè)工程師:

8、DisciplineEngineer:年(Y)月(M)日(D)技術(shù)負(fù)責(zé)人:TechnicalResponsiblePerson質(zhì)量檢查員:QualityInspect:安裝人:Installer年(Y)月(M)日(D)SH3503–J623主匯線槽、主橋架安裝檢查記錄InstallationInspectionRecdofMainRacewayCableTray工程名稱:ProjectDeion:單元名稱:UnitDeion:名稱Nam

9、e檢查項目ItemofInspection檢查結(jié)果InspectionResult檢查日期InspectionDate備注Remark1匯線槽、橋架安裝橫平、豎直,多層安裝時各層彎曲部分的弧度一致,且層間間距均勻,彎曲半徑應(yīng)滿足電纜敷設(shè)時彎曲半徑的要求InstallationofmainracewayCabletrayshouldbeflatstraight.Whenseverallayersareinstalledradianofcu

10、rvinginlayersshouldbeconsistentinevendistancecurvingradiusshouldmeettherequirementsofcablelaying.2鍍鋅、涂漆表層完好無損Galvanizedvarnishedcoatingshouldbeingoodcondition.3對口連接牢靠、無毛刺,并預(yù)留適當(dāng)?shù)呐蛎涢g隙,螺栓連接處已安裝加強(qiáng)板,螺母在匯線槽的外側(cè)Connectionofcable

11、endsshouldbefirmwithoutburrsisreservedwithproperexpansionclearance.Reinfcingplateisinstalledatboltingjoints.Nutsarelocatedoutsidetheraceway.4匯線槽、橋架與支架連接牢靠,水平安裝長度超過50m有應(yīng)力消除措施Connectionofracewaycabletraybracketisfirmlength

12、ofhizontalinstallationisbeyond50mameasurefstressreleaseistaken.5匯線槽、橋架已避開強(qiáng)電磁場、高溫、腐蝕性介質(zhì)Racewaycabletrayarekeptawayfrommediumofhighelectromagicfieldhightemperatureerosion.6匯線槽上的保護(hù)管開孔位置在匯線槽高度的23處以上Openingholefracewayprotect

13、ionpipeislocatedabove23heightcleartheraceway.7匯線槽、橋架清凈,內(nèi)部平整、光潔、無雜物、無毛刺Itiscleaninsurfaceofracewaycabletrayisflatclearwithoutdebrisburrsinside.8匯線槽的隔板固定合理、牢靠Clapboardofracewayisfixedproperlyfirmly.9匯線槽的蓋板固定合理、牢靠Theraceway

14、iscoveredproperlyfirmly.10匯線槽的支架間距合理,且焊接牢靠Distancebetweenbracketsofracewayisreasonableisfixedbywelding.11匯線槽有良好的接地Theracewayisproperlygrounded.注:主匯線槽、主橋架指就地接線盒至控制室之間的匯線槽、橋架。Remark:Mainracewaymaincabletrayrefertoracewayca

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 眾賞文庫僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。

評論

0/150

提交評論